Water Meter Fee Schedule
LUE’s per meter size meter installation fee:
Meter Size
|
LUE
|
Fee/LUE
|
Fee
|
5/8"
|
1
|
$500.00
|
$500.00
|
3/4"
|
1.5
|
$500.00
|
$750.00
|
1"
|
2.5
|
$500.00
|
$1,250.00
|
1-1/2"
|
5
|
$500.00
|
$2,500.00
|
2"
|
8
|
$500.00
|
$4,000.00
|
3"
|
16
|
$500.00
|
$8,000.00
|
4"
|
25
|
$500.00
|
$12,500.00
|
6"
|
50
|
$500.00
|
$25,000.00
|
8"
|
80
|
$500.00
|
$40,000.00
|
10"
|
115
|
$500.00
|
$57,500.00
|
(Ordinance 2012-20 adopted 5/1/12)
Any unauthorized use of water, bulk or domestic, can result in the termination of services and prosecution under the City of Gonzales Code of Ordinances section 1.109
Sewer Tap Fee
- Four inch (4") connection: $1,500.00.
- Six inch (6") connection: $2,500.00.
- Eight inch (8") connection: $3,500.00.
- Taps larger than eight inches (8") or under circumstances that increase the cost of any tap the customer shall pay the actual construction cost.
(Ordinance 2012-20 adopted 5/1/12)
Electric Fee Schedule
SECURITY LIGHT INSTALLATION:
|
|
|
150 HPS
|
|
|
|
$125.00
|
150 HPS/WOOD POLE
|
|
$350.00
|
LIGHT RELOCATION
|
|
|
$125.00
|
LIGHT/POLE RELOCATION
|
|
$350.00
|
STEEL POLE
|
|
|
$850.00
|
|
|
|
|
|
|
NEW SERVICES AND SERVICE UPGRADES (120/240)
|
30 FT. WOOD SERVICE POLE
|
|
$300.00
|
TEMPORARY LOOP
|
|
|
$150.00
|
100 AMP
|
|
|
|
$200.00
|
200 AMP
|
|
|
|
$250.00
|
320 AMP
|
|
|
|
$400.00
|
400 AMP +
|
|
|
$600.00
|
TRANSFORMER CAPACITY FEE (PER KVA)
|
$10.00
|
|
|
|
|
|
|
|
|
3-PHASE (120/240-120/208
|
|
|
400 AMP
|
|
|
|
$750.00
|
400 AMP +
|
|
|
$1,000.00
|
TRANSFORMER CAPACITY FEE (PER KVA)
|
$10.00
|
|
|
|
|
|
|
|
|
3-PHASE (277/480) COST + 10%
|
|
|
|
|
|
|
|
|
|
3-PHASE PADMOUNT CAPACITY FEE
|
|
(PER KVA)
|
|
|
$15.00
|
|
|
|
|
|
|
|
PRIMARY LINE EXTENSIONS: COSTS+10%
|
|
|
|
|
|
|
|
RELOCATION OF EXISTING LINES OR POLES COST + 10%
|
|
|
|
|
|
PRIMARY LINE CLEARANCES
|
|
$250.00
|
SECONDARY LINE CLEARANCES
|
|
$150.00
|
|
|
|