| Utility Fee Schedule Adopted July 18, 2011
|
| Security Lights
|
| 150 HPS
|
$125.00
|
| 150 HSP / Pole
|
$350.00
|
| Relocation Light
|
$125.00
|
| Relocation Light / Pole
|
$350.00
|
| Metal Light Pole, Only Areas w/ URD
|
$850.00
|
| New Services and Service Upgrades (120/240 V)
|
| 30' Wood Service Pole (If needed.)
|
$300.00
|
| Temporary Loop
|
$150.00
|
| 100 Amp
|
$200.00
|
| 200 Amp
|
$250.00
|
| 320 Amp
|
$400.00
|
| Transfer Capacity Fee per KVA
|
$10.00
|
| Single Phase Large 120/240 V
|
| 400 Amp CT Meter System
|
$600.00
|
| Transformer Capacity Fee per KVA
|
$10.00
|
| Three Phase 120/240-120-208
|
| 400 Amp CT Meter System
|
$750.00
|
| Over 400 Amp CT Meter System
|
$1,000.00
|
| Transformer Capacity Fee per KVA
|
$10.00
|
| Three Phase 277/480
|
Cost + 10%
|
| Three Phase Pradmounts per KVA
|
$15.00
|
| Primary Extensions
|
Cost + 10%
|
| Relocation Existing Lines or Pole Removal
|
Cost + 10%
|
| Primary Line Clearances
|
$250.00
|
| Secondary Line Clearances
|
$150.00
|
| Service Calls
|
| Serviceman dispatched at customer's request and trouble found to be customer's.
|
| 8:00 am to 5:00 pm, Monday - Friday
|
$25.00
|
| 5:00 pm Friday - 8:00 am Monday and Holidays
|
$50.00
|
| Banners, Flags or Ropes
|
$100.00
|
| Reconnects After Hours
|
$75.00
|
| Same Day Connects
|
$50.00
|
| Damage of City Equipment or Facilities
|
Cost + 10%
|
| Utility Fee Schedule
|
| Same Day Connect
|
$50.00
|
| New Service
|
$15.00
|
| Return Check
|
$25.00
|
| New Service Minimum Deposit Residential
|
$200.00
|
| New Service Minimum Deposit Commercial
|
$300.00
|
| Reconnect, 8 am - 5 pm
|
$50.00
|
| Reconnect, After Hours
|
$75.00
|
| Reconnect at the Pole
|
$100.00
|
| Reconnect at the Pole After Hours
|
$200.00
|
| Same Day Meter Install (New Construction)
|
$200.00
|
| Additional Meter Review
|
$25.00
|